NLL Camden Road work package reduced
Started Paul Scott · Date: Sep 15, 2008 08:34 · 50 post(s)
August Playlists: Pushing The Envelope WHUS / Storrs, Connecticut
Started joelkru · Date: Sep 7, 2008 10:50 · 1 post(s)
North London Line blockade
Started Peter Lawrence · Date: Aug 19, 2008 13:43 · 42 post(s)
Re: Should I buy a gas gussler?
Started Bob · Date: Aug 15, 2008 11:06 · 24 post(s)
Storage of London tube stock?
Started johnnyburke02 · Date: Aug 1, 2008 09:04 · 20 post(s)
Bridge joints
Started John Rowland · Date: Jul 29, 2008 05:40 · 3 post(s)
Re: 2.5 month closure of Watford DC Lines to Euston
Started 1506 · Date: Jul 2, 2008 10:15 · 2 post(s)
Re: Would an Evolutionist get on a Bullet Train knowing there are tracks missing down the line ?
Started bob young · Date: Jun 20, 2008 21:32 · 52 post(s)
Lords Cricket Ground disused tunnel
Started Paul Scott · Date: Apr 10, 2008 11:25 · 134 post(s)
ANTU
Started Anthropy · Date: Apr 4, 2008 17:43 · 692 post(s)
Last week hot threads
No posts for a week
Latest posts
Re: NLL Camden Road work package reduced
Group: uk.transport.london · Group Profile · Search for primrose in uk.transport.london
Author: Andy
Date: Sep 17, 2008 15:10

... there can possibly be a stock shortage. If there's enough stock to run the normal Euston-Watford and NLL services, then there's enough to run Euston-Watford as normal and Stratford to Willesden Jn going via Primrose Hill instead of West Hampstead.) The reason why the trains switch to AC is because trains using the DC stretch along there would have to go at half power. Isn't that just a general feature of ...
Show full article (2.31Kb)
Re: NLL Camden Road work package reduced
Group: uk.transport.london · Group Profile · Search for primrose in uk.transport.london
Author: somersetchris
Date: Sep 17, 2008 07:31

... to AC, but presumably DC can still be used.) (Not that there can possibly be a stock shortage. If there's enough stock to run the normal Euston-Watford and NLL services, then there's enough to run Euston-Watford as normal and Stratford to Willesden Jn going via Primrose Hill instead of West Hampstead.) The reason why the trains switch to AC is because trains using the DC stretch along there would have to go at half power.
Show full article (1.41Kb)
Re: NLL Camden Road work package reduced
Group: uk.transport.london · Group Profile · Search for primrose in uk.transport.london
Author: Andy
Date: Sep 17, 2008 04:58

... problem meaning that the service had to use either the northern pair of tracks or Stratford high level. Of course, the 508s might not have the correct paperwork anyway. (Not that there can possibly be a stock shortage. If there's enough stock to run the normal Euston-Watford and NLL services, then there's enough to run Euston-Watford as normal and Stratford to Willesden Jn going via Primrose Hill instead of West Hampstead.)
Show full article (1.71Kb)
Re: NLL Camden Road work package reduced
Group: uk.transport.london · Group Profile · Search for primrose in uk.transport.london
Author: MIG
Date: Sep 17, 2008 01:03

... the 313s normally switch to AC, but presumably DC can still be used.) (Not that there can possibly be a stock shortage. If there's enough stock to run the normal Euston-Watford and NLL services, then there's enough to run Euston-Watford as normal and Stratford to Willesden Jn going via Primrose Hill instead of West Hampstead.) I think you could get to Stratford Low Level on third rail, but is that what they are using now?
Show full article (1.38Kb)
Re: NLL Camden Road work package reduced
Group: uk.transport.london · Group Profile · Search for primrose in uk.transport.london
Author: asdf
Date: Sep 16, 2008 23:20

.... Can't Watford Junction to Stratford be done entirely on DC? (There's a dual-electrified stretch where the 313s normally switch to AC, but presumably DC can still be used.) (Not that there can possibly be a stock shortage. If there's enough stock to run the normal Euston-Watford and NLL services, then there's enough to run Euston-Watford as normal and Stratford to Willesden Jn going via Primrose Hill instead of West Hampstead.)
Show full article (1.19Kb)
Re: NLL Camden Road work package reduced
Group: uk.transport.london · Group Profile · Search for primrose in uk.transport.london
Author: Mizter T
Date: Sep 16, 2008 15:08

... track anyway (2 via Gospel Oak and 2 via Primrose Hill). With it also effectively going to be 4 ... would have enabled any remaining NLL freight to access Primrose Hill as required. Said freight wouldn't have dedicated ... from the CTRL/HS1 along the NLL then via Primrose Hill and up the WCML), which would require minimal ... also the freight crossing at the junction onto the Primrose Hill route. Arguably the problem here is the freight ...
Show full article (3.95Kb)
Re: NLL Camden Road work package reduced
Group: uk.transport.london · Group Profile · Search for primrose in uk.transport.london
Author: Jamie Thompson
Date: Sep 16, 2008 14:25

... get west of Camden Rd they are effectively on four track anyway (2 via Gospel Oak and 2 via Primrose Hill). With it also effectively going to be 4 tracks east of Dalston (2 to New Cross and 2...widening the viaduct for 10-odd metres or so, and a crossover would have enabled any remaining NLL freight to access Primrose Hill as required. Said freight wouldn't have dedicated refuge loops, but then most of it'd probably be running via...
Show full article (1.76Kb)
Re: NLL Camden Road work package reduced
Group: uk.transport.london · Group Profile · Search for primrose in uk.transport.london
Author: Paul Scott
Date: Sep 16, 2008 10:55

somersetchris wrote: Not quadrupling through Camden Rd will create a very nasty pinch point. As soon as trains get west of Camden Rd they are effectively on four track anyway (2 via Gospel Oak and 2 via Primrose Hill). With it also effectively going to be 4 tracks east of Dalston (2 to New Cross and 2 to Stratford) what is needed is 4 tracks between Dalston and Camden Rd. This is going to remove a lot of pathways for freight and...
Show full article (0.92Kb)
Re: NLL Camden Road work package reduced
Group: uk.transport.london · Group Profile · Search for primrose in uk.transport.london
Author: Peter Masson
Date: Sep 16, 2008 07:40

...-17b43619cf9a@79g2000hsk.googlegroups.com... Not quadrupling through Camden Rd will create a very nasty pinch point. As soon as trains get west of Camden Rd they are effectively on four track anyway (2 via Gospel Oak and 2 via Primrose Hill). With it also effectively going to be 4 tracks east of Dalston (2 to New Cross and 2 to Stratford) what is needed is 4 tracks between Dalston and Camden Rd. This is going to remove a lot of ...
Show full article (0.84Kb)
Re: NLL Camden Road work package reduced
Group: uk.transport.london · Group Profile · Search for primrose in uk.transport.london
Author: somersetchris
Date: Sep 16, 2008 05:33

Not quadrupling through Camden Rd will create a very nasty pinch point. As soon as trains get west of Camden Rd they are effectively on four track anyway (2 via Gospel Oak and 2 via Primrose Hill). With it also effectively going to be 4 tracks east of Dalston (2 to New Cross and 2 to Stratford) what is needed is 4 tracks between Dalston and Camden Rd. This is going to remove a lot of pathways for freight and non LOROL trains from the NLL....
Show full article (1.24Kb)