Whatever DML at Devonport has done to the power cars will have been per a contract. If the contract was to only perform a component exchange overhaul then the people of Grand Central who prepared the spec need to reevaluate their ideas on using long term stored rail vehicles in intensive 125mph service. However, if the powercars were subject to a full overhaul, rewire etc then the issue
|